Multiple Choice Questions on SDLC - SET 1

 System Development Life Cycle:

Multiple Choice Questions: SET 1

1. SDLC stands for …………….

a) Software Development Learn Cycle                b) System Development Life Cycle

c) System Diagram Learning Center                    d) Secure Development Life Cycle

Ans: b) System Development Life Cycle

2. The waterfall model suggests a systematic …………..

a) Iterative approach              b) Spiral approach

c) Sequential approach           d) None of these

Ans: c) Sequential approach

3. ……….. of the system gives long life to the new system.

 a) Implementation                 b) Maintenance          c) Analysis                   d) Design

Ans: b) Maintenance

4. In this Phase the software is checks for bugs and verifies its performance before delivery to users.

 a) Requirement Collection                b) Design

  c) Development                                d) Testing

Ans: d) Testing

5. What does the study of an existing system refer to?

  a) Feasibility Study                            b) System Testing

  c) System Analysis                             d) System Design

Ans: a) Feasibility Study

6. …………. Is the first phase of SDLC?

 a) System Design                               b) System Study

  c) System Analysis                             d) System Implementation

Ans: b) System Study

7. Requirement collection methods include ……………..

 a) Workshop                           b) Interview                c) Questionnaires        d) All of the above

Ans: d) All of the above

8. Which is not include in Feasibility study?

 a) Technical                           b) Operational                        c) Financial                 d) System

Ans: d) System

9. A sequence of steps for solving a problem using diagram is ………………

  a) ERD                                   b) DFD                         c) Flowchart                d) Algorithm

Ans: c) Flowchart

10. ____________ manage the system development, assign staff, manage the budget and reporting, and ensure that deadlines are met.
a) Project managers                    b) Network engineers
c) Graphic designers                    d) Systems analysts

Ans: a) Project managers